Skip to content
Landfill

Minot Municipal Landfill

Minot, Ward County, ND · All sites in Ward County

Minot Municipal Landfill is a landfill in Minot, Ward County, North Dakota, operated by City of Minot. The site also works as a C&D landfill and a yard waste site. EPA landfill data show it opened in 1993, with closure projected for 2033.

According to EPA's Disaster Debris Recovery Tool, it takes brush & limbs, construction debris, household trash and yard waste. It is one of 9 disposal sites we list in Ward County.

What it takes

Accepted

  • Brush & limbs (accepted)
  • Construction debris (accepted)
  • Household trash (accepted)
  • Yard waste (accepted)

Materials as listed by EPA's Disaster Debris Recovery Tool. Anything not shown may still be accepted, or refused; ask the facility before loading.

Landfill facts

Status (EPA)Open
Opened1993
Projected closure2033
Waste in place276,396 tons (2003)
Size12 acres
OwnerCity of Minot
OperatorCity of Minot
Landfill gas collectionNo

Source: EPA Landfill Methane Outreach Program database, data as of September 2024.

Hauling construction debris in North Dakota? Compare every site that takes it on the North Dakota construction debris list.

Not on file yet

This listing does not have opening hours, fees or residency rules yet. We only publish details we can trace to a source, so call the site before you load up. Send us the details if you run or use this facility.

Location and nearby sites

1234567820 miN

48.21299, -101.34491

Google Maps OpenStreetMap

  1. Transfer station

    Kalix

    4.5 mi E · Minot, ND

More in Ward County

Minot Municipal Landfill: questions

What does Minot Municipal Landfill accept?

Brush & limbs, construction debris, household trash and yard waste, according to EPA's Disaster Debris Recovery Tool. Ask the facility about anything not on this list.

Does Minot Municipal Landfill take construction debris?

Yes. Its listed materials include construction debris.

When is Minot Municipal Landfill expected to close?

EPA's Landfill Methane Outreach Program lists a projected closure year of 2033 for a landfill that opened in 1993 (data as of September 2024). Projections change as permits are renewed or expanded.

Before you haul

About this listing

Facts on this page come from:

Newest source record dated March 10, 2025. Listed here since October 5, 2026. We are an independent directory, not the operator. How we source and check listings.

Something wrong or out of date? Report a correction.